Skip to content

Report a Typo or Mistake

Optional

Optional

Optional

The Drift: Cost overruns, construction delays and a strike bogs down progress at Gogama mine project
https://www.sudburyminingsolutions.com/the-drift/the-drift-cost-overruns-construction-delays-and-a-strike-bogs-down-progress-at-gogama-mine-project-5334974
Verify